Handover is not a ribbon. It is a slow walk through every room with the project lead, a pen, and a list.
The walk-through checklist
Open and close every door, drawer, and shutter.
Switch on every light and test every socket.
Run every tap and check under the sinks.
Look at paint and joinery edges in daylight.
Check that the AC drains and the remotes work.

Handover day, after the last snag was closed.
Snag list to sign-off
Step | Who | When |
|---|---|---|
Walk-through and snag list | Client and project lead | Handover day |
Snags fixed | Site team | Within 7 days |
Final sign-off | Client | After the re-check |
Aftercare visit | Project lead | Around 3 months later |
Nothing is signed until the last item on the list is closed in writing.